Electrical PPE inspection: insulated gloves and hot sticks
Daily air tests, 6-month glove dielectric testing, 2-year hot stick checks, and the test records OSHA expects.
- OSHA 1910.137
- OSHA 1910.269
- ASTM D120
- ASTM F496
Checked against the sources on . General information, not legal advice.
Before each day’s use
Visual check, air test (gloves), wipe (hot sticks)
- Who
- The user
- Record
- Not required by OSHA
Every 6 months
Dielectric test (gloves)
- Who
- Qualified test lab
- Record
- Employer certification required
Every 2 years
Examination and test (hot sticks)
- Who
- Employer or test lab
- Record
- Employer must demonstrate compliance
After damage or repair
Remove and electrically retest
- Who
- Qualified test lab
- Record
- Certification before reuse
On this page
OSHA sets hard legal intervals for electrical protective equipment. Under 29 CFR 1910.137 for general industry (and the matching 29 CFR 1926.97 for construction), rubber insulating gloves must be inspected and air-tested before each day's use and electrically tested every 6 months while in service. Under 29 CFR 1910.269(j) (and 29 CFR 1926.957 for construction), live-line tools such as hot sticks must be wiped and visually checked daily, then pulled from service every 2 years for thorough examination and testing.
ASTM D120 covers how rubber insulating gloves are manufactured, classified, and acceptance-tested. ASTM F496 covers their in-service care and retesting. OSHA references both standards in the notes to 1910.137 as recognized methods for meeting its testing rules.
Rubber insulating glove testing intervals
OSHA 1910.137(c)(2)(viii) and Table I-5 set maximum electrical retest intervals for each type of rubber insulating equipment. Missing a 6-month glove retest date puts an uncertified barrier between a technician and energized parts.
| Equipment | OSHA Table I-5 retest interval | Event-triggered retests |
|---|---|---|
| Rubber insulating gloves | Before first issue and every 6 months | Suspect insulating value, after repair, or after use without protectors |
| Rubber insulating sleeves | Before first issue and every 12 months | Suspect insulating value or after repair |
| Rubber insulating blankets | Before first issue and every 12 months | Suspect insulating value or after repair |
| Rubber line hose and covers | No fixed calendar interval | Suspect insulating value or after repair |
Plan a rotation pool so technicians always have a freshly tested pair on hand before the current pair hits its 6-month due date.
Glove voltage classes and proof tests
OSHA 1910.137(c)(2)(i) requires maximum use voltages to stay within Table I-4. Never let a technician wear a glove rated below the system voltage they are working on.
| Glove class | Max use voltage (AC) | AC proof-test voltage | DC proof-test voltage |
|---|---|---|---|
| Class 00 | 500 V | 2,500 V | 10,000 V |
| Class 0 | 1,000 V | 5,000 V | 20,000 V |
| Class 1 | 7,500 V | 10,000 V | 40,000 V |
| Class 2 | 17,000 V | 20,000 V | 50,000 V |
| Class 3 | 26,500 V | 30,000 V | 60,000 V |
| Class 4 | 36,000 V | 40,000 V | 70,000 V |
OSHA 1910.137(a)(1)(ii) requires every glove to be clearly marked with its class and whether it is Type I (not ozone-resistant) or Type II (ozone-resistant).
Daily inspection, air test, and leather protectors
Under 1910.137(c)(2)(ii), the user must inspect rubber insulating equipment before each day's use and immediately after any incident that could reasonably have caused damage. For gloves, OSHA explicitly requires an air test alongside the visual check.
How to run the daily check
- Check the test stamp. Confirm the glove is within its 6-month in-service window and within 12 months of its last electrical test date.
- Inspect inside and out. Look closely at the fingers, palms, and cuffs in good light for cuts, snags, ozone cracks, or swelling.
- Roll and air-test. Trap air inside the glove by rolling the cuff tightly toward the palm, or use a field glove inflator. Listen and feel against your cheek for escaping air while inspecting the stretched rubber for pinholes.
- Inspect the leather protectors. Check for embedded metal shavings, staples, tears, or oil soaking that could puncture or degrade the rubber liner.
Leather protector glove rules
OSHA 1910.137(c)(2)(vii) requires protector gloves to be worn over insulating gloves. There is a narrow exception for Class 0 gloves under limited-use conditions where small parts require unusually high finger dexterity, and for other classes only when the employer can demonstrate that physical damage is unlikely and the gloves are used at a reduced voltage class.
Under 1910.137(c)(2)(vii)(D), any insulating glove used without a protector glove cannot be reused until it passes an electrical retest.
When to remove gloves from service
OSHA 1910.137(c)(2)(iii) prohibits using rubber insulating equipment that shows any of the defects below. Pull the pair immediately and quarantine it from the jobsite.
Remove from service if
- Any hole, tear, puncture, or cut, no matter how small.
- Ozone cutting or ozone checking (a series of interlacing cracks on stressed rubber).
- Any embedded foreign object, such as a wire strand or metal shaving.
- Texture changes: swelling, softening, hardening, stickiness, or loss of elasticity.
- Any other defect that damages the insulating properties, or an expired or illegible test date.
Under 1910.137(c)(2)(x) and (xi), repairs to gloves are allowed only in the cuff area between the wrist and the reinforced edge of the opening. Repaired equipment must pass an electrical retest before returning to service. Never patch a palm or finger; destroy failed gloves so they cannot end up back in a truck bin.
Hot sticks and live-line tools
OSHA covers live-line tools (hot sticks, shotgun sticks, switch sticks, and insulated poles) under 29 CFR 1910.269(j) for general industry electric power work and 29 CFR 1926.957 for construction.
Daily wipe and visual check
Under 1910.269(j)(2)(i), each live-line tool must be wiped clean with a clean, dry cloth (or silicone-treated wiping cloth per the manufacturer) and visually inspected before use each day. Check for deep scratches, gouges, moisture absorption, cracked gloss, loose hardware, or contamination.
Under 1910.269(j)(2)(ii), if any defect or contamination that could affect insulating value or mechanical strength remains after wiping, remove the tool from service for examination and testing before anyone uses it again.
Biennial (2-year) examination and electrical test
Under 1910.269(j)(2)(iii), live-line tools used for primary employee protection must be removed from service every 2 years for thorough examination, cleaning, repair, and testing.
OSHA 1910.269(j)(2)(iii)(C) requires an electrical test after that 2-year examination when:
- The tool has been repaired or refinished, regardless of material.
- The tool is made of wood or hollow fiberglass-reinforced plastic (FRP).
- The tool is made of solid or foam-filled FRP, unless the employer can demonstrate that the examination revealed every defect that could cause failure in use.
When electrical testing is required, 1910.269(j)(2)(iii)(E) requires a wet-condition test across the full working length at 75,000 volts per foot (246,100 volts per meter) for 1 minute for fiberglass tools, or 50,000 volts per foot (164,000 volts per meter) for 1 minute for wood tools, or an equivalent test method.
What records OSHA requires
OSHA does not require a written log of daily pre-use visual checks or air tests. It does require formal proof of periodic dielectric testing.
Under 1910.137(c)(2)(xii), the employer must certify that rubber insulating equipment has been tested as required. The certification must identify two things:
- The specific equipment that passed the test (such as a serial number or asset ID).
- The date it was tested.
The note to 1910.137(c)(2)(xii) confirms that marking the equipment (such as a lab test stamp on the glove cuff) and entering test results and dates into a log are both acceptable ways to meet this requirement. Keeping both a physical stamp and a central digital log protects you when ink rubs off a cuff in the field or when you need to prove testing history across multiple crews. For more on retention periods, see how long to keep safety inspection records and competent person vs. qualified person.
GreenTagWorks
What GreenTagWorks does about this
Give every pair of insulating gloves and every hot stick its own record and schedule: every 6 months for gloves, every 12 months for sleeves and blankets, and every 2 years for live-line tools. Technicians scan a barcode, QR, or NFC tag from their phone, online or offline; any failed check takes a reason and a photo and puts the item out of service until cleared. Due and overdue tests show by site on the web and on the inspector's phone, with signed, time-stamped PDFs or share links ready when an auditor asks.
Official sources
- OSHA 29 CFR 1910.137, Electrical protective equipment
- OSHA 29 CFR 1910.269, Electric power generation, transmission, and distribution
- OSHA Standard Interpretation (August 19, 2020), Testing intervals for rubber insulating gloves
- ASTM F496, Standard specification for in-service care of insulating gloves and sleeves
- ASTM Subcommittee F18.15, Worker personal equipment standards (including ASTM D120 and ASTM F496)
This guide summarizes publicly available requirements for general information. It is not legal advice. Standards change and local codes, state plans and manufacturers can ask for more, so check the official text, the manufacturer's instructions and your authority having jurisdiction, or ask a qualified safety professional, before relying on it.